Latex Condom Dipping Production Facility

Main products: Latex/PU/PVC/Nitrile gloves for household, industry, flocking, coating on cotton lining gloves for industry. The equipment has best quality, this is the size we generally establish.Of course ,our company can produce machine according the customer's requirements!
Chat Now

Product Details

latex condom dipping production facility

Main products:

Latex/PU/PVC/Nitrile gloves for household, industry, flocking, coating on cotton lining gloves for industry.

The equipment  has best quality, this is the size we generally establish.Of course ,our company can produce machine according the customer's requirements!


Technical parameters:
Model
JB-CD01
JB-CD02
Size(L*W*H)
35*1.6*1.9m
50*1.6*1.9m
Capacity
9000 pcs/hr
13000 pcs/hr
Moulds
1800 pcs
2600 pcs
Heat
350000Kcal/hr
420000Kcal/hr
Latex
140 ton/year
210 ton/year


Latex condom dipping production facility
condom making line
latex condom making machine


Our Services

1. Term and method of service

(1) service term: our company shall be responsible for the free maintenance of the hardware (except for human or natural irresistible force) for one and half year after the successful operation of the equipment, and the lifetime warranty shall be implemented.

(2), service mode, such as system appear problem, you can inform me through telephone, fax, and other communications companies, clear problem, our response time is 1 hour, by telephone, fax, and other means of communication to solve the problem; If the problem is not solved, our staff will arrive at the customer factory for repair after the negotiation

 

 

2. Technical training and quality assurance measures

Technical training: after production line transport to customer factory, our company is responsible for provide the expensive unit with 2-3 people to customer factory to assist installation and free technical training, the training of personnel familiar with the use of the system, and can deal with the problems in the operation of the system, to achieve an orderly management and daily maintenance of technical level. The training content mainly includes: 1) installation method and system composition of equipment; 2) function of the equipment of the system; 3) connections between devices; 4) operation methods and precautions of each equipment; 5) daily maintenance of the system; 6) processing of common faults in the system.

    

 

3.other Service 

Charging standard and main parts price of the charging project one year free warranty and technical advisory services. After 1 year, free maintenance and technical consulting services will be provided. Only material cost will be charged for replacement

 

FAQ

FAQ

1.Q: How much does the product cost?

   A: We quote the price according to the customers demands,different specifications of the production line price is different

2.Q: How long does it take to make the machine?

   A: 3 months.

3.Q: How about the quality?

  A: We have one year quality guarantee,our customers have used our machines for a long time. 


Inquiry